Overview
Site development and utilities in Edmond and the Oklahoma City metro: drainage, grading, underground utilities, site concrete and permit layers.
Project Details
Category
Area
- Edmond and the Oklahoma City metro
Next step
General Contracting Services
Site Development and Utilities in Edmond and Oklahoma City
Before a footing is dug, the site has already answered most of the questions that matter: where the water goes, how deep the utilities sit, what the soil will carry and whether the road in front of it can take the trucks. Site development is the work of finding those answers on paper and then making them true in the field, and it is the part of a project that most often decides whether a building opens on time.
General Contractors of Edmond handles clearing, grading, drainage, underground utilities, paving and site concrete for commercial, industrial and multifamily projects across the Oklahoma City and Edmond metro. We design the schedule around approvals and storm season, and we tell owners early what the city will ask. On a site package, that usually means stormwater, erosion control and utility capacity letters long before the first building permit. Owners who gather that paper early rarely lose time to it later, and owners who wait often do.
We handle site work on its own for owners who have another builder for the building, and as part of a complete project for those who want one team from raw ground to final paving.
Water Decides the Site Plan
Water is the first design driver in this region. Arcadia Lake in eastern Edmond, just east of Interstate 35, covers 1,820 acres, was created by an earthen dam on the Deep Fork River, and was built to control floods in the Deep Fork River Basin. Wikipedia describes Tuttle as located in a low-lying river basin along the South Canadian River. Sites near creeks and river bottoms in the metro need drainage plans that account for floodplain, high groundwater and heavy rain on saturated ground.
We review the floodplain map, the geotechnical report and the city's drainage criteria before we price. Detention basins, storm sewers, culverts and erosion control are sized by the engineer and built by us, and we plan the earthwork so that basins are excavated early and the soil is reused on site where possible. Our pages on stormwater and drainage and mass grading describe each element.
Utilities in Sequence
Underground utilities follow a sequence. Storm sewer is generally first because it is deepest and depends on grade, then sanitary sewer, water, fire lines, gas, electric and communications. Each has its own inspection, its own provider and its own lead time, and conflicts between them are the leading cause of rework. We coordinate with the providers, prepare a composite utility plan and locate existing lines before digging.
Edmond's electric service comes from Edmond Electric, a publicly owned power company noted by the Greater Oklahoma City Chamber, so power requests there go through the city. Elsewhere in the metro the provider differs, and we confirm the contact at the start. We also schedule tie-ins into live lines for off-hours, with notice to affected neighbors.
Site Concrete, Paving and Earthwork
We manage much of the site concrete and paving closely: curb and gutter, sidewalks, dumpster pads, truck aprons and drive lanes. That control matters because site concrete is among the most visible and most inspected work, and its quality affects stormwater flow and accessibility. Our trade partners build to the city's details and the accessibility requirements, and we coordinate striping, signage and lighting. See our parking lot construction page for the paving side.
Earthwork is the other major item we manage closely on suitable projects. Cut and fill balance, haul distance, moisture conditioning of soils and compaction testing all affect cost and schedule. Wet seasons can halt earthwork, so we try to complete mass grading and drainage before storm season peaks. A pad that sits wet through a rainy spell is a pad that will not pass a compaction test, so we build in float and keep haul roads stabilized.
Layers of Site Approval
Permits for site work come in layers. The city reviews the grading, drainage and utility plans; the state or the city issues stormwater and erosion control approvals; and utility providers approve connections. Edmond's code page states that permits applied for or issued on or after August 14, 2023 fall under the 2018 codes, and its FAQ says a building permit is required for detached structures over 200 square feet. Oklahoma City lists the 2018 International Building Code and has separate permits for storm shelters.
Public improvements add review. A 2019 ODOT and City of Edmond study of I-35 through Edmond proposed reducing frontage roads to one lane and adding one-lane bridges at the Memorial Road, 33rd, 15th and 2nd Street intersections at an estimated cost of about $20 million, and the city reopened West Danforth Road and North Kelly Avenue after a $9 million safety project. Owners near the corridor should ask the city about road plans before they finalize driveway locations.
Growth Edges and Prepared Land
Our site work covers the metro's growth edges. The City of Choctaw's Tax Increment Financing District No. 1 covers approximately 311 gross acres along the commercial corridor north and south of NE 23rd Street for retail, office and residential development infrastructure, and Norman's University North Park Advanced Manufacturing Centre offers a 30-acre site with lots of four to 15 acres and all utilities available. Those programs show what public and private owners do to prepare land.
If you are comparing locations, the Choctaw, Arcadia and Tuttle pages give local context. Developers can read how we work with them on our commercial real estate developer page, and our warehouse page shows the building that most often follows a site package.
Review the Land Before You Buy It
Send the parcel, the planned use and any reports you have, and we will tell you what the ground, the water and the utilities are likely to cost.
Common Questions
What should I check before buying land?
Check the floodplain, the soil, the utility capacity and the zoning. A short feasibility study can reveal costs, such as off-site utility extensions or detention, that change the land's value. We perform this review for owners before they close.
How long does a site package take?
It depends on size, soil and weather. A typical commercial lot can be prepared in weeks to a few months, while a large industrial site takes longer. The approvals and utility connections often set the pace more than the dirt work does.
Who handles erosion control?
We install and maintain controls during construction under the approved plan, and the owner's engineer inspects. Controls are checked after rain events and repaired promptly.
Can you build a site for another contractor's building?
Yes. We coordinate pad elevations, utility stubs and schedules with the building contractor, and we deliver a finished pad on an agreed date.
Do utilities cost much more in a rural area?
Often yes, because lines are farther away and capacity may be limited. We request provider letters and extension estimates before the owner commits to a site.
Related
Related Services
Related Building Types
Related Service Areas
Ready to talk about your project?
More General Contracting Services
Commercial Construction
Commercial construction in Edmond and the Oklahoma City metro, with permit.
Office Building Construction
Office building construction in Edmond and Oklahoma City: hail-ready envelopes.
Retail and Shopping Center Construction
Retail shopping center construction across Edmond and the Oklahoma City metro.